Grassy Narrows First Nation – Water Treatment Plant Upgrade
S. Burnett & Associates Limited was retained by Asubpeeschoseewagong First Nation also known as Grassy Narrows First Nation to complete the design of the interim upgrades to existing water treatment plant (WTP) to remove the Boil Water Advisory. The community’s original WTP has reached the end of its design capacity and is not capable of effectively treating the surface water supply to meet Ontario Federal Standards and ultimately has put the community on a Boil Water Advisor

SBA
1 day ago1 min read
Â
Â
Â


Georgina Island First Nation – Water Treatment Plant Upgrade & Expansion
Project Description: In 2015, SBA was contracted by Georgina Island First Nation to provide engineering services for the design and commissioning of the Water Treatment Plant Upgrade and Expansion Project. The original water treatment plant was constructed in 1992 and was exhibiting extensive deficiencies. As a result, the plant was no longer considered a suitable treatment technology for surface water supply based on current Ministry of the Environment, Conservation & Parks

SBA
1 day ago1 min read
Â
Â
Â


Town of Shelburne Sandhill Court Reconstruction Project
SBA provided the Town of Shelburne with design and construction services for the replacement of watermain and water services, storm...

SBA
Mar 311 min read
Â
Â
Â


Town of Orangeville B-Line Watermain Project
SBA provided the Town of Orangeville with engineering services for the design and construction oversight of the excavation and placement...

SBA
Mar 311 min read
Â
Â
Â


Town of Shelburne Elevated Water Storage Tank
SBA currently provides various design, consultants, contract administration and quality assurance/inspection services to the Town of...

SBA
Mar 311 min read
Â
Â
Â


Town of Shelburne Pumphouse No.3 Water Treatment System Upgrades
The Town of Shelburne faced issues with arsenic levels in the water at the Well No.3 Pumphouse, which exceeded the maximum acceptable...

SBA
Mar 311 min read
Â
Â
Â


Town of Shelburne Municipal Class Environmental Assessment – Water Supply
SBA was retained to complete a Schedule ‘B’ Municipal Class Environmental Assessment (EA) to address a projected shortfall in water...

SBA
Mar 311 min read
Â
Â
Â


Township of Emo Watermain Expansion Project, Front Street & Canning Lane
SBA provided the Township of Emo with engineering services for a watermain expansion for Front Street and Canning Lane within the...

SBA
Mar 311 min read
Â
Â
Â


Township of Emo Water Treatment Plant Upgrades
SBA provided the Township of Emo with engineering services for the upgrades to the Community’s existing Water Treatment Facility. ...

SBA
Mar 311 min read
Â
Â
Â


Neskantaga First Nation Water Systems Assessment
SBA was retained by Neskantaga First Nation in 2021 to complete an assessment of the current water and wastewater systems within the...

SBA
Mar 311 min read
Â
Â
Â


Rainy River First Nation - Water Treatment Plant Upgrades
SBA was retained by Rainy River First Nation for the design and construction of upgrades to the Community’s existing Water Treatment...

SBA
Mar 191 min read
Â
Â
Â


Mississaugas of Scugog Island First Nation - Water Treatment Plant and Water Tower
The Mississaugas of Scugog Island First Nation Water Treatment Plant and Water Tower were substantially completed in mid-2020. The...

SBA
Mar 192 min read
Â
Â
Â


Grassy Narrows First Nation - Water Supply, Treatment and Distribution
Design and Contract Administration SBA successfully completed the design, tender, contract administration and construction oversight of...

SBA
Mar 192 min read
Â
Â
Â


Naicatchewenin First Nation - Water Supply, Treatment and Distribution
Design and Contract Administration SBA completed the design, tender, contract administration and construction oversight of a new Water...

SBA
Mar 191 min read
Â
Â
Â


Chippewas of Georgina Island First Nation - Water Treatment Plant
The Chippewas of Georgina Island First Nation Water Treatment Plant was successfully commissioned in December 2019. SBA was retained by...

SBA
Mar 191 min read
Â
Â
Â


Lac Seul First Nation - Kejick Bay Water Treatment Plant
The Lac Seul First Nation Kejick Bay Water Treatment Plant was substantially completed in December 2019. The commissioning of the new...

SBA
Mar 191 min read
Â
Â
Â


Big Grassy First Nation - Water Treatment Plant Upgrades
Feasibility, Design, and Contract Administration SBA completed the Feasibility Assessment, Design and Contract Administration for an...

SBA
Mar 191 min read
Â
Â
Â


Mitaanjigamiing First Nation – WTP Upgrade Project
Project Description: SBA was retained in 2017 by Mitaanjigamiing First Nation to complete the design for upgrades to the community’s water treatment plant (WTP). With a number of parameters non-compliant with federal and provincial standards, these upgrades will resolve water quality issues and provide drinking water capacity to support Mitaanjigamiing’s 20-year growth. SBA has finalized the detailed design and construction is set to begin in late Spring 2020. As part of this

SBA
Jan 211 min read
Â
Â
Â


Town of Shelburne – Well 7&8 Class Environmental Assessment
Project Description: S. Burnett & Associates Limited (SBA) is leading a Schedule B Municipal Class Environmental Assessment (EA) for the Town of Shelburne (the Town) to assess its current water supply system and to determine the best means of meeting demand for the next 20 years. The Town of Shelburne has experienced rapid population growth over the past 8+ years and additional groundwater is needed to support the Town’s predicted population and current build-out areas. SBA a